ask-first-eda

Equipment Sensors walkthrough

These synthetic current and vibration readings for four pumps are licensed under MIT. The conversation includes replies from a simulated user. Dataset provenance and license

Step 0 — Input

File Size Format
sensor_readings.parquet 716,362 bytes Parquet

The analysis read all four Parquet row groups, covering 34,560 rows and seven columns. Each observation is for one pump and one five-minute timestamp in September 2025, Asia/Seoul.

Interview

User: Here are current and vibration readings for four pumps. Could you look at September as a whole and tell me when any of the pumps ran abnormally and whether any need inspection? I’ll use this to plan next week’s maintenance.

Analyst: When run_cmd is blank, should I infer that a pump was running from its motor current, as for P-01 at 21:45 on September 27 when it drew 43.368 A, or count only readings with run_cmd = 1?

User: Yes. When run_cmd is blank, count the pump as running if its current exceeds 20% of its rated current. Otherwise, count it as stopped. That P-01 reading counts as running.

Analyst: What rated current should I use for P-01 and P-04, the two pumps with blank run_cmd readings?

User: Use 42 A for P-01 and 31 A for P-04.

Analyst: Should I use your site’s current and vibration limits to flag abnormal operation, or compare each pump with its own typical running readings?

User: For vibration during operation, use 2.8 mm/s RMS for caution, 4.5 mm/s for alarm, and 7.1 mm/s for danger. A rise that lasts at least two weeks warrants inspection even below the alarm threshold. I don’t know what current limits to use for abnormal operation.

Analyst: Should I assess the first five-minute reading after each pump starts separately from steady operation when flagging abnormal current?

User: Yes. Treat the first 10 minutes after a restart as a transient period and exclude inrush current during that time when flagging equipment anomalies.

What the analysis did

Quality checks and aggregation

The analyst retained source row numbers and sorted readings by pump and timestamp. A command of 1 identifies running observations. When the command is blank, the analyst used current strictly above 20% of rated current (42 A for P-01 and 31 A for P-04). The report found 264 readings with a missing field.

Excluded rows and metric definitions

Running-vibration comparisons use 31,416 readings after excluding 3,090 stopped readings and 54 missing vibration readings from P-04 (rows 28,648–28,701). Site thresholds for running vibration are 2.8 mm/s RMS for caution, 4.5 for alarm, and 7.1 for danger. The current screen sets aside 66 restart readings in the first 10 minutes after an observed restart and uses the remaining 31,404 readings for pump-specific comparison. Engineering limits for current were unavailable.

Inspection findings

Report

HTML report · JSON summary

Report headline

Inspect P-02 first after three vibration episodes reached danger, peaking at 7.89 mm/s RMS. Inspect P-03 for 24 days of rising daily median vibration in sensor_readings.parquet.

Chart questions

Ambiguity log

ID Topic Status Decision
A01 Business process resolved Current and vibration monitoring for four pumps.
A02 Decision resolved Prioritize inspections based on September readings.
A03 Row grain resolved One pump and timestamp per five-minute observation.
A04 Operating eligibility resolved Use the run command and apply the rated-current fallback only when the command is blank.
A05 Time basis resolved Use September 2025 in Asia/Seoul.
A06 Thresholds and exceptions resolved Apply the site vibration thresholds, two-week rise rule, and 10-minute current exclusion after restarts.
A06a Engineering limits for current unresolved Limits are unknown. Screen against each pump’s own steady running current.
A07 Missing measurements resolved Leave missing vibration unobserved. Apply the agreed fallback to command gaps.
A08 Join keys not applicable The analysis uses one Parquet table.